Apply for a hydropower survey licence in Nepal
A plain-language Nepal guide for developers proposing to study a hydropower project who need to prepare a hydropower survey licence application, with evidence, submission, safety, and official-source checks.
Independent guide, not an official website
Nepal Docs Guide is not affiliated with the Government of Nepal. This guide helps you prepare, but official portals and offices control final rules, fees, forms, and timelines.
Quick answer
To prepare a hydropower survey licence application, prepare company and promoter records, project location, capacity and coordinates, technical and financial capability, preliminary study and work programme, confirm the current process with the Department of Electricity Development, ERC and relevant grid utility, complete the official application, and keep the receipt or reference for follow-up.
Eligibility
- Developers proposing to study a hydropower project
- Applicants who need to prepare a hydropower survey licence application using matching and genuine records
- An authorized representative only when the responsible authority accepts representation
Required documents checklist
- □ Licensed company, promoter, project or authorized representative identity
- □ company and promoter records
- □ project location, capacity and coordinates
- □ technical and financial capability
- □ preliminary study and work programme
- □ Official DoED, ERC, NEA or project application and licence reference
- □ Official licence, regulatory, study, grid or service fee receipt
- □ Any correction, consent, authorization, or supporting record required for your specific case
Step-by-step process
- Confirm that the Department of Electricity Development, ERC and relevant grid utility is the correct authority for this request.
- Compare names, dates, addresses, registration numbers, account numbers, and other identifiers across company and promoter records, project location, capacity and coordinates, technical and financial capability, preliminary study and work programme.
- Check project availability and capacity category, submit the exact survey area and work plan, respond to technical review, and conduct studies only within the issued licence.
- Submit through the official portal or office and pay only through the approved channel.
- Save the application number, receipt, uploaded-file copies, and any written instruction for follow-up.
Fees and timelines
- Do not rely on an old fee screenshot or an agent's estimate. Check the latest official notice, citizen charter, portal, or responsible office before paying.
- Processing time depends on document matching, office workload, inspection, examination, technical review, or approval level. Keep the receipt and follow-up reference.
Common mistakes
- Using an old form, notice, fee, or unofficial link
- Submitting incomplete or mismatched company and promoter records, project location, capacity and coordinates, technical and financial capability, preliminary study and work programme
- Paying an unofficial person or personal account without an official receipt
- Ignoring the difference between a new application, renewal, correction, duplicate, verification, or transfer
- A survey licence reserves a defined study right; it does not authorize construction, land acquisition or electricity sale.
Confirm the current electricity licence, grid code, PPA and regulatory filing requirement
This is an independent preparation guide, not an official notice, legal opinion, professional licence, approval, or guarantee. Requirements can change. Confirm the current form, fee, deadline, jurisdiction, and eligibility with the responsible authority before submitting.
To prepare a hydropower survey licence application, prepare company and promoter records, project location, capacity and coordinates, technical and financial capability, preliminary study and work programme, confirm the current process with the Department of Electricity Development, ERC and relevant grid utility, complete the official application, and keep the receipt or reference for follow-up.
Who this guide helps
Developers proposing to study a hydropower project Applicants who need to prepare a hydropower survey licence application using matching and genuine records An authorized representative only when the responsible authority accepts representation
Why this document or approval matters
A survey licence reserves a defined study right; it does not authorize construction, land acquisition or electricity sale.
Evidence to prepare
- Licensed company, promoter, project or authorized representative identity
- company and promoter records
- project location, capacity and coordinates
- technical and financial capability
- preliminary study and work programme
- Official DoED, ERC, NEA or project application and licence reference
- Official licence, regulatory, study, grid or service fee receipt
- Any correction, consent, authorization, or supporting record required for your specific case
A safe step-by-step process
- 1Confirm that the Department of Electricity Development, ERC and relevant grid utility is the correct authority for this request.
- 2Compare names, dates, addresses, registration numbers, account numbers, and other identifiers across company and promoter records, project location, capacity and coordinates, technical and financial capability, preliminary study and work programme.
- 3Check project availability and capacity category, submit the exact survey area and work plan, respond to technical review, and conduct studies only within the issued licence.
- 4Submit through the official portal or office and pay only through the approved channel.
- 5Save the application number, receipt, uploaded-file copies, and any written instruction for follow-up.
The decision point most applicants miss
Confirm whether the proposed capacity is below or above the current category threshold and whether another application overlaps the site.
After submitting
- Check the spelling and reference number on the acknowledgement or receipt.
- Track the application only through the official portal, SMS, email, or office contact.
- Respond to a deficiency notice with the requested evidence rather than creating a duplicate application.
- Keep the final certificate, licence, approval, account update, or rejection reason with the supporting records.
Avoid document and payment shortcuts
Do not alter certificates, hide mismatches, upload another person's records, share passwords or OTPs, pay an unofficial personal account, or accept a promise of guaranteed approval. Use the official portal and keep payment and submission evidence.
What was verified from the official source
The official department site lists survey and generation licences and applications for hydro, solar, wind, biomass, thermal, cogeneration and transmission-line projects, together with notices, citizen-charter and project information. Check Department of Electricity Development for the newest notice, form, service link, fee, and final instruction.
Office and portal links
Printable checklist
Apply for a hydropower survey licence in Nepal
- Licensed company, promoter, project or authorized representative identity
- company and promoter records
- project location, capacity and coordinates
- technical and financial capability
- Official DoED, ERC, NEA or project application and licence reference
- Official licence, regulatory, study, grid or service fee receipt
- Official source checked on the submission date
FAQ
Official sources
Use these references for final confirmation before applying. Nepal Docs Guide is independent and does not replace official instructions.
- Department of Electricity Development
Government of Nepal · last accessed Jul 12, 2026
The official department site lists survey and generation licences and applications for hydro, solar, wind, biomass, thermal, cogeneration and transmission-line projects, together with notices, citizen-charter and project information. Time-sensitive requirements must still be rechecked before submission.
Need official confirmation?
If your case involves corrections, deadlines, legal use, foreign submission, or a rejected application, contact the relevant official office before paying fees or submitting documents.
Author
Nepal Docs Guide Editorial Desk
Citizen services research team
Our editorial desk turns official notices, portal instructions, and field-tested document workflows into plain-language guides. Every guide is independently written and points readers back to official sources for final confirmation.
Was this guide helpful?
Get update alerts
Join the newsletter placeholder for future reminders when high-priority guides need review.
Related guides
Apply for a hydropower generation licence in Nepal
A plain-language Nepal guide for developers moving from study to construction and operation who need to prepare a hydropower generation licence application, with evidence, submission, safety, and official-source checks.
Renew a hydropower survey licence in Nepal
A plain-language Nepal guide for survey licence holders needing additional lawful study time who need to prepare a hydropower survey licence renewal, with evidence, submission, safety, and official-source checks.
Renew or extend a hydropower generation licence
A plain-language Nepal guide for licensed projects approaching a licence or milestone deadline who need to prepare a generation licence extension or renewal, with evidence, submission, safety, and official-source checks.